Permit to work. A printable permit to work for the jobs that need one — hot work, confined space, excavation, live services, roof work — with the precautions, the time limits and the hand-back on one sheet.
This is the paper version. BuildOptix does the same job on a phone, with the record filed against the site and the operative automatically.

What is on the sheet
- Permit number, site, exact location, the work and who is doing it
- Permit type, so one form covers the common cases without pretending they are the same job
- Precautions before work starts, isolations made and by whom, and the equipment required
- Who may work under the permit, and what adjacent work must not happen at the same time
- Validity: start, expiry and extension, each signed rather than assumed
- Hand-back and cancellation — area checked, isolations restored, permit closed by name
Why this record matters
A permit to work is a conversation that leaves a record. Its value is not the paper; it is that somebody competent had to stop, look at the specific job, and decide what must be true before it starts — and that the person doing the work had to sign that they understood it.
The part that fails is the end. Permits are issued carefully and closed carelessly: the job finishes, everybody leaves, and the isolation stays in, the detection stays covered, the excavation stays open. The hand-back block is the reason this form exists in the shape it does, and the cancellation signature is the single most important line on it.
Time limits are fields rather than printed figures. How long a permit may run, and whether a fire watch continues after hot work, depends on the job, the site and whoever is competent to set it — and a duration printed on a generic form becomes the duration everybody uses.
One form covering several permit types is a deliberate compromise. A specialist confined space permit is a better document than this; what this is for is the site that currently has no permit system at all and is doing hot work on a Friday afternoon.
Use it with
- RAMS templateA printable risk assessment and method statement — the hazards and controls on one side, the sequence of work on the other, and the briefing record that proves the gang was told.
- Site inspection recordA printable site safety inspection record — a structured walk of the site, what was found, who owns each finding and whether it was closed.
- Toolbox talk recordA printable toolbox talk record — the subject, what was actually covered, who attended, what they raised and what was done about it.
Read more on this
© 2026 BuildOptix. Free to print, copy and use in your business. Not for resale. Please keep this notice.
Contains public sector information licensed under the Open Government Licence v3.0. General guidance, not legal advice. Checked October 2026.