NEWRecognition module — recognise hard work and the people going above and beyond
BuildOptixConstruction software

Sites & projects

Every site you run, in one register

BuildOptix holds every site you run in a single register — profile, programme stage, principal contractor, the people assigned and every record raised against it. The all-sites view and a single site's workspace are the same data seen at two distances.

A main contractor's problem is rarely one site. It is six, at different stages, with different subcontractors on each, and a compliance position that nobody can state out loud without opening six folders first. The register exists so that the answer to how are we doing is a screen rather than an afternoon.

Programme stage is part of the site record rather than something tracked alongside it, because what a site owes changes as it moves. A job in pre-construction owes an F10 and a construction phase plan. A job three weeks from handover owes a health and safety file. Holding the stage on the record is what lets the platform surface the right thing at the right point.

Access follows the same logic. Site staff see the sites they work on, not the whole portfolio, which keeps a supervisor's view to the job in front of them and keeps commercially sensitive work off screens that do not need it.

What it does

One register, every site

Site profile, programme stage and principal contractor held in one place, so the basic facts about a job live somewhere other than a project manager's head.

Two distances, one set of records

Switch between an all-sites view and a single site's workspace without changing systems. The portfolio view is a lens on the same records, not a separate report that has to be rebuilt.

Role-based visibility

Staff see only the sites they are assigned to. Access is granted by role rather than by remembering to share a folder.

Schedules without a spreadsheet

Drag-and-drop shift and trade scheduling with bulk patterns, and permission-gated editing so a supervisor can move their own trades without rewriting the programme.

One calendar across every site

RAMS reviews, inductions and inspections on a single calendar, filterable by site or type, with each event linking straight through to the site or subcontractor record behind it.

What goes wrong without it

  • The compliance position is known site by site and never across the portfolio, so the first sign of a gap is somebody else finding it
  • Next week's schedule is rebuilt from scratch in a new spreadsheet, and last week's is the only surviving record of who was actually on site
  • A site reaches handover and its records are spread across a shared drive, an inbox, and a filing cabinet in a cabin that has already gone
  • A new starter is given access to everything, because access is a folder and folders do not have roles