NEWRecognition module — recognise hard work and the people going above and beyond
BuildOptixConstruction software

Planning & documents

What is pre-construction information?

Pre-construction information is the information a client provides about the site and the project that designers and contractors need to plan the work safely — what is already there, and what is known about it.

pre-construction information — diagram Pre-construction information is the information a client provides about the site and the project that designers and contractors need to plan the work safely — what is already there, and what is known about it. Pre-construction What is already there,from the client Phase plan How this site will be run,before work starts RAMS Task by task, briefed tothe people doing it H&S file What a stranger needs toknow in fifteen years
Pre-construction information, shown in the documents a project produces.
Use this diagram+

Free to use on your own site, in training material or in a handout, as long as the credit link stays on it. Paste this where you want the diagram to appear.

<figure>
  <img src="https://buildoptix.co.uk/glossary/pre-construction-information/diagram.svg" alt="pre-construction information — diagram from BuildOptix" width="880" height="620" loading="lazy">
  <figcaption>
    <a href="https://buildoptix.co.uk/glossary/pre-construction-information">What is pre-construction information?</a> — diagram by
    <a href="https://buildoptix.co.uk">BuildOptix</a>
  </figcaption>
</figure>

It is about the existing situation rather than the intended one: services, ground conditions, asbestos surveys, structural information, restrictions on access and anything known about the building's history.

Its absence is what turns a planned job into an improvised one. A team that discovers a live service or an asbestos-containing material at the point of breaking into a wall is managing an emergency that information would have made a method.

It is a client duty, and 'we don't have it' is not a complete answer where the information is reasonably obtainable. Commissioning a survey is often the thing the duty actually requires.

What goes wrong in practice

  • Issued as a folder of whatever existed, with nothing identifying what is relevant or what is missing.
  • An asbestos survey of the wrong type for the work being done.
  • Known site constraints held informally by the client's facilities team and never passed on.